Learning Path - System Integrators
Target Audience
Overview
FrameworX serves diverse professionals across the industrial automation spectrum. This guide provides tailored learning paths for System Integrators, helping you focus on the most relevant features and capabilities for your role. Each path includes specific tutorials, exercises, and real-world scenarios designed to accelerate your proficiency.
Learning Path for System Integrators
...
System integrators delivering complete solutions from design through deployment
...
, managing projects,
...
implementing standards, and
...
ensuring successful delivery.
Learning Objectives
...
...
- Design scalable architectures
...
- Implement industry standards
...
- Manage multi-site deployments
...
- Create reusable templates
...
- Deliver complete solutions
Week 1: Foundation
...
Day 1-2: Architecture Planning
System Sizing Calculator
...
Component | Small (< 1K tags) | Medium (1K-10K tags) | Large (> 10K tags) |
---|---|---|---|
CPU | 4 cores | 8 cores | 16+ cores |
RAM | 16 GB | 32 GB | 64+ GB |
Storage | 250 GB SSD | 500 GB SSD | 1 TB+ SSD RAID |
Network | Single Gigabit | Redundant Gigabit | Redundant 10 Gigabit |
Clients | Up to 10 | Up to 50 | 50+ |
Scan Rate | 1 second | 500 ms | 250 ms |
History Retention | 90 days | 1 year | 2+ years |
Availability Target | 99% | 99.5% | 99.9% |
Exercise: Design Multi-Site Architecture
- Define site requirements:
- Number of sites
- Tag count per site
- Communication between sites
- Redundancy requirements
- Plan network topology:
- WAN connectivity
- Bandwidth requirements
- Latency constraints
- Specify hardware per site
- Design redundancy strategy
- Document architecture diagram
Day 3-4: Template Development
...
Creating Reusable Solutions
...
Standard Project Structure
Code Block |
---|
ProjectTemplate/ ??? Standards/ ? ??? NamingConvention.docx ? ??? ColorStandards.xml ? ??? AlarmPhilosophy.docx ??? UDTs/ ? ??? Motors.xml ? ??? Valves.xml ? ??? Instruments.xml ??? Graphics/ ? ??? Symbols.library ? ??? Templates.displays ? ??? Navigation.menu ??? Scripts/ ? ??? Calculations.cs ? ??? Reports.sql ??? Documentation/ ??? UserManual.docx ??? QuickStart.pdf |
Lab: Create Reusable Template
- Create base project structure
- Define naming conventions:
- Tags:
Area_Equipment_Parameter
- Displays:
Area_Function_Type
- UDTs:
Equipment_Vendor_Model
- Tags:
- Build standard UDTs for common equipment
- Create symbol library
- Document standards
Day 5: Project Delivery Methods
Implementation
...
Phases
Phase | Duration | Deliverables |
---|---|---|
Discovery | 1 week | Requirements document, Site survey, Risk assessment |
Design | 2 weeks | Architecture design, Standards document, Design review |
Development | 4 weeks | Configuration, Programming, Unit testing |
Deployment | 1 week | Installation, Commissioning, Training |
Week 2: Advanced
...
Project Phases:
??????????????????????????????????
? Phase 1: Discovery (1 week) ?
? • Requirements gathering ?
? • Site survey ?
? • Risk assessment ?
??????????????????????????????????
? Phase 2: Design (2 weeks) ?
? • Architecture design ?
? • Standards development ?
? • Review & approval ?
??????????????????????????????????
? Phase 3: Development (4 weeks) ?
? • Configuration ?
? • Programming ?
? • Testing ?
??????????????????????????????????
? Phase 4: Deployment (1 week) ?
? • Installation ?
? • Commissioning ?
? • Training ?
??????????????????????????????????
...
Topics
Day 1-2: Standards Implementation
ISA Standards Compliance
Standard |
---|
Focus Area | Implementation | |
---|---|---|
ISA-88 | Batch Control | Recipe management, |
phase logic | ||
ISA-95 | MES Integration | Level models, B2MML interfaces |
ISA-18.2 | Alarm Management | Philosophy document, rationalization |
ISA-101 | HMI Design | Display hierarchy, |
color standards | ||
ISA-99/IEC-62443 | Cybersecurity | Zones, conduits, security levels |
Exercise: Implement ISA-101 Display Hierarchy
- Level 1 - Overview displays (plant-wide)
- Level 2 - Area displays (unit operations)
- Level 3 - Detail displays (equipment)
- Level 4 - Support displays (diagnostics)
- Create navigation structure
- Apply consistent color scheme
- Document display standards
Day 3-4: Performance Optimization
Large System Optimization
...
Strategies
Area | Technique | Implementation |
---|---|---|
Database | Partitioning by date | Monthly partitions for historical data |
Database | Index optimization | Clustered index on timestamp |
Communication | Protocol efficiency | Use bulk reads, minimize polling |
Communication | Compression | Enable data compression |
Processing | Distributed computing | Split processing across servers |
Processing | Edge processing | Local data aggregation |
Client | Lazy loading | Load displays on demand |
Client | View optimization | Limit points per display |
Lab: Optimize Large System
- Analyze system performance baseline
- Identify bottlenecks:
- Database queries
- Network traffic
- CPU utilization
- Implement optimizations
- Measure improvement
- Document settings
Day 5: Solution Validation
...
Test Categories and Procedures
Test |
---|
...
Type | Focus | Method |
---|---|---|
Functional | I/O |
...
verification, Control logic, Alarms | Point-to-point testing | |
Performance | Load testing, Stress testing, Endurance | Simulate maximum load |
Security | Access control, Audit trails | Penetration testing |
Acceptance | User requirements, Performance criteria | Witness testing |
Project Estimation Guidelines
Task | Hours per Unit | Notes |
---|
...
System Integrator Toolkit
Project Management Templates
- Statement of Work (SOW)
- Functional Specification
- Design Specification
- Test Procedures
- Training Materials
- Handover Documentation
Estimation Guidelines
Tag Configuration | 0.1 hour/tag | Including alarming |
Display Development | 4-8 hours/display | Depends on complexity |
Device Integration | 2-4 hours/device | Including testing |
Alarm Configuration | 0.2 hour/alarm | Including documentation |
Testing | 20% of development | All test categories |
Documentation | 15% of development | User and technical docs |
Training | 16 hours minimum | 2 days |
on-site |
Quality Assurance Checklist
- Requirements traced to implementation
- All I/O points verified
- Alarms tested and documented
- Performance requirements met
- Security measures implemented
- Backup/recovery tested
- Documentation complete
- Training delivered
- Support handover complete
Certification Paths
Available Certifications
Certification | Target Audience | Prerequisites | Exam Topics |
---|---|---|---|
FrameworX Certified Developer | All paths | Basic training | Configuration, displays, basic scripting |
FrameworX Solution Architect | System Integrators | FCD + project experience | Architecture, standards, deployment |
Next Steps
Continue Learning
- Hands-On Practice - Build sample projects
- Community Forum - Join discussions
- Advanced Training - Specialized courses
- Certification - Validate your skills
- Real Projects - Apply knowledge
Resources
...
Project Management Templates
Required Documentation
Document | Purpose | When |
---|---|---|
Statement of Work | Define scope and deliverables | Pre-project |
Functional Specification | Detail requirements | Discovery phase |
Design Specification | Technical design | Design phase |
Test Procedures | Validation methods | Development phase |
Training Materials | User education | Deployment phase |
Handover Documentation | Support transition | Project close |
Multi-Site Deployment Strategy
Approach | Pros | Cons | Best For |
---|---|---|---|
Centralized | Single point of management | WAN dependency | < 5 sites |
Distributed | Local autonomy | Complex management | > 10 sites |
Hybrid | Balance of both | Higher complexity | 5-10 sites |
Troubleshooting Guide
Issue | Investigation | Resolution |
---|---|---|
Performance degradation | System metrics analysis | Apply optimization strategies |
Communication failures | Network diagnostics | Verify routing, firewall rules |
Synchronization issues | Time server configuration | Configure NTP properly |
Template conflicts | Version comparison | Implement version control |
Deployment failures | Installation logs | Verify prerequisites |
Certification Path
FrameworX Solution Architect
- Prerequisites: FrameworX Certified Developer + project experience
- Focus Areas: Architecture design, standards implementation, project delivery
- Format: Online exam + architecture review project
- Duration: 6 hours
Additional Resources
- Architecture Design Guide
- ISA Standards Implementation
- Project Template Library
- Multi-Site Deployment Guide
- Community Forum - Architecture Section
...