Case Study | Herzog | Rail Transportation

This case study explores the implementation of a Rail Transportation Signal Testing System using the FrameworX platform by Tatsoft, a real-time SCADA and IIoT platform.

CHALLENGE

Before the introduction of the new Signal Testing System, testing and commissioning railway signal systems were labor-intensive and error-prone. Several signal personnel were required to be present in the field during the cutover phase to manipulate signal inputs and outputs, making it a time-consuming and costly process. Testing engineers often had limited visibility of the overall control system, leading to potential errors and delays in the cutover process.

SOLUTION

FrameworX by Tatsoft was selected as the platform to build the Signal Testing System due to its flexible, real-time capabilities. The system was designed to allow remote manipulation of signal systems from a centrally located mobile command center (Cutover Trailer), eliminating the need for on-site personnel at multiple field locations during signal system testing. The two main components of the system are:

RESULTS

The Signal Testing System, built using FrameworX by Tatsoft, has revolutionized how Herzog tests and commissions railway signal systems. By leveraging remote manipulation and centralized control, the system has:


DOWNLOAD THE FULL CASE STUDY